Project Status: In Progress Project Highlights: • 43,000 sq. ft. • 217 tons of structural steel Owner: U.S. Army Architect: PDG Architects Norman, OK Contractor: The Ross Group Tulsa, OK | This project consists of a gymnasium, an individual work out area with cardio-machines and weight lifting equipment, a suspended running track and fitness rooms. The combination of very demanding areas with the architectural intensive structure made for a project that required considerable design coordination. Speed Steel’s team was able to work together to produce this complex structure in five months. The involvement of the erection and fabrication staff during design made the construction of this project much faster and easier. Speed Steel gave the general contractor $55,000 in Value engineering savings. |